design for TAMA300 control and DAQ
(ICALEPCS'95, Chicago, Oct.-Nov.1995) [130k]
KEK Preprint 95-141, ICRR-Report-342-95-8
introduce EPICS and status in Japan
(RCNP DAQ workshop, Osaka, Sept.1995) [830k]
VIRGO control system, conceptual design in 1992
(Real-time workshop at NAO, Dec.1994) [210k]
Seismic monitor for the KEK-Linac
(LINAC94, Tsukuba, Aug.1994) [160k]
Proc. 1994 Int'l Linac Conf, p.822; KEK-Preprint 94-73
Control of laser interferometer
(GRW-HandBook, Oct.1992) [580k]